Mills, P. (2013). Construction cost forecast model : model documentation and technical notes (Report No. CDOT-2013-6). Colorado. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/23396
Mills, Peter. Construction cost forecast model : model documentation and technical notes. Report no. CDOT-2013-6. Colorado. Dept. of Transportation, 2013. https://rosap.ntl.bts.gov/view/dot/23396.
Mills, Peter Construction cost forecast model : model documentation and technical notes. Colorado. Dept. of Transportation, 2013, Report no. CDOT-2013-6, ROSA P. https://rosap.ntl.bts.gov/view/dot/23396.
NTL-ECONOMICS AND FINANCE-ECONOMICS AND FINANCE
;
NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance
;
NTL-HIGHWAY/ROAD TRANSPORTATION-Materials
Abstract:
Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes
;
in the quantities of construction bid items, as well as changes in price to change the cost indices of those items.
;
These cost indices, while useful in forecasting the near-term costs of construction contracts for projects that
;
have been designed and are about to be let, are not good indicators of price inflation in highway construction.
;
This report contains the documentation and supporting technical notes for a statistical model that estimates
;
changes in the price components of the Colorado Construction Cost Index. The model contains two
;
specifications. In the first, the composite construction index is a function of the producer prices of inputs: oil,
;
concrete, steel, labor and equipment. In the second, the composite construction index is a function of the price of
;
oil, wages and nationwide demand for construction services.
Mills, P. (2013). Construction cost forecast model : model documentation and technical notes (Report No. CDOT-2013-6). Colorado. Dept. of Transportation. https://rosap.ntl.bts.gov/view/dot/23396
Mills, Peter. Construction cost forecast model : model documentation and technical notes. Report no. CDOT-2013-6. Colorado. Dept. of Transportation, 2013. https://rosap.ntl.bts.gov/view/dot/23396.
Mills, Peter Construction cost forecast model : model documentation and technical notes. Colorado. Dept. of Transportation, 2013, Report no. CDOT-2013-6, ROSA P. https://rosap.ntl.bts.gov/view/dot/23396.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.