Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.
-
2008-01-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed using the fogging system and Bridge 5701 was placed using conventional curing methods. Since weather conditions influence evaporation rate, weather conditions were monitored throughout the construction processes. A windbreak was erected to reduce the wind speed during the placement and fogging of Bridge 5500. Visual inspections of cracks were conducted 7, 14, 21, 28 and 56 days after the construction of each bridge. Bridge 5500 exhibited substantially more cracks than Bridge 5701. The additional cracking in Bridge 5500 is attributed to more severe evaporation conditions during placement and inefficiencies associated with the fogging system. Cracking occurred in both bridges to concrete that was exposed to evaporation rates that exceeded 0.1 lb/ft2/hr.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: