Crumb rubber modified asphalt concrete in Oregon : summary report.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Crumb rubber modified asphalt concrete in Oregon : summary report.

Filetype[PDF-2.35 MB]


English

Details:

  • Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    Over the last nine years, the Oregon Department of Transportation (ODOT) has constructed 13 projects using crumb rubber modifiers (CRMs) in asphalt concrete pavements using both the wet and dry process. Three of the projects included more than one type of CRM. All projects included a control section. Research data have been collected on the majority of projects and five construction reports have been written detailing the results. State and federal legislation may require the use of recycled rubber in asphalt concrete, therefore, the Oregon Department of Transportation is interested in determining the most cost-effective crumb rubber modified asphalt concrete. This report includes a literature review on the use of CRMs in asphalt concrete pavement and a review of non-ODOT CRM paving projects constructed by Oregon counties and cities and the Washington Department of Transportation. In addition, the report summarizes the data collected on all CRM hot mix asphalt concrete pavement projects constructed by ODOT. The ODOT information includes background, construction, cost, and performance data for each of the test and control sections. Finally, the future activities of the project are reviewed. The short pavement history precludes selection of a process based on performance. The results of the study indicate that if a CRM process were to be selected today, pavements constructed with PBA-6GR would be the most economical in terms of initial cost/ton. The PBA-6GR is also very easy to use since the rubber modified binder is blended at the refinery and delivered to the job site ready for mixing with the aggregate. This process reduces the number of errors possible during construction since the rubber content and the mixing process are tightly controlled at the refinery. Additional testing of the PBA-6GR is necessary to ensure that a product that meets the ODOT specifications is consistently available.
  • Format:
  • Funding:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov