Rapid bridge construction technology : precast elements for substructures.
-
2011-06-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The goal of this research was to propose an alternate system of precast bridge substructures which can
substitute for conventional cast in place systems in Wisconsin to achieve accelerated construction.
Three types of abutment modules (hollow wall with cap, full height socketed, partial height socketed) are
proposed for use in Wisconsin. Design calculation sheets, example designs, and standard type drawings have
been provided for the modules. A special design method (in MathCad) and tutorial is provided for detailing
reinforcing around the embedded pile in the socket of the abutments.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: