ITS procurement : analysis and recommendations.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

ITS procurement : analysis and recommendations.

Filetype[PDF-3.07 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Final report.
    • Abstract:
      Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been through three rounds of proposals and two court challenges. The Northern Virginia Traffic Management System has had durability and maintenance problems with the changeable message signs it purchased. A number of vendors were reluctant to participate in a preliminary study for the Hampton Roads ITS Planning Study, because they were afraid they would be precluded from any resulting construction work. To determine what options exist, the constraints imposed on procurement by federal and state law were examined. Under both Virginia and federal regulations and laws, competitive negotiations may be used with the proper authorization. Virginia law provides unsuccessful offerors the right to both administrative proceedings and court challenges. If federal research funds are used, limitations are placed on the extent to which Virginia can obtain intellectual property rights for any innovations or inventions that result. There are two possible approaches to improving the procurement of ITS within the existing statutory framework. One would be to alter the regulations and guidelines to improve the procurement process, clarifying when it is appropriate to use competitive negotiations and what type of specifications are appropriate with competitive negotiations. Another possible change would be the drafting of regulations authorizing the construction of highway systems through approaches like design-build and systems integration. More drastic changes that should be considered include limiting court challenges of contract awards by unsuccessful offerors. This could take place either through placing limitations on the right to a court challenge or by allowing the state to substitute some other process, such as alternative dispute resolution, for the court challenge. Either of these changes would require legislative approval.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26