Heat-curved girders : deflections and camber loss during and subsequent to bridge construction.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Heat-curved girders : deflections and camber loss during and subsequent to bridge construction.

Filetype[PDF-1.64 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      The present AASHTO bridge design specifications require that additional camber be built into steel girders that are to be heat curved. The additional camber is provided to allow for subsequent losses due to the dissipation of residual stresses imposed by the heat-curving process during fabrication of the girders. Many bridge engineers and steel fabricators, however, question whether the additional camber is necessary. To check the camber loss in a heat-curved girder bridge, a 140-ft., simply supported span was instrumented during construction of the bridge. The span was composed of four steel plate girders having radii of curvature varying from 802.51 ft. on the inside to 834.51 ft. on the outside of the alignment curvature. Girder deflection and camber loss were measured prior to and subsequent to the construction of the bridge deck. The AASHTO specifications for highway bridges indicate that losses of camber in heat-curved girders will occur both during construction of the bridge and subsequently under service loading. It is suggested that 50 of the camber loss will occur during construction and an additional 50% after the bridge has been subjected to several months of service loading. For the bridge investigated, some camber loss due to construction loading occurred shortly after placement of the concrete deck. The amount of loss, however, was only one-fourth of that determined from the AASHTO equation. In addition, there were no significant camber losses due to service loading over 6% months. The total loss under both construction and service loading was only 13% of that predicted by the AASHTO equation. Therefore, the results of the study suggest that the relationship given in the specifications for the calculation of the potential camber loss in a heat-curved girder is not applicable to girders having radii of curvature greater than 800 ft. The order of magnitude of the camber losses further suggests that the specifications may not be completely applicable to girders having radii of curvature less than 800 ft.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26