Evaluation of the new Virginia Dept. of Highways and Transportation skid testing trailer.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Evaluation of the new Virginia Dept. of Highways and Transportation skid testing trailer.

Filetype[PDF-2.40 MB]


English

Details:

  • Creators:
  • Corporate Creators:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • OCLC Number:
    5071647
  • Corporate Publisher:
  • Abstract:
    The purpose of this study was to evaluate the new skid trailer obtained by the Virginia Department of Highways & Transportation and to determine how the survey skid testing program should be conducted in light of the findings. Specifically, those things considered about the new trailer were: (1) testing precision; (2) operational error, defined as unexplained day-to-day variation; (3) the speed-skid number relationships obtained for some customary surface types used in Virginia; and (4) the relationship of the new skid trailer to the Research Council's skid trailer and stopping distance car. Based on the findings of the study several recommendations were made, including the following: (1) Normal survey testing should be done at 40 mph (64 km/h). (2) Corrections to skid numbers obtained at speeds other than the intended test speed should be based on a slope of -.55. (3) Control site testing should be included as a normal part of survey skid testing, and skid test results should be adjusted based on control site test results. (4) Survey skid test data collected with the trailer should be reported in terms of predicted stopping distance car skid numbers based on regression results obtained in this study. (5) The relationships between the three testing devices should be verified at least annually. (6) The testing rate in the survey program should be five tests per lane mile. (7) At sites having borderline skid resistance, additional testing should be run with the trailer before taking action or verifying the results with stopping distance car tests when the standard deviation of the trailer results exceeds 2.25.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov