A study of girder deflections during bridge deck construction : final report.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

A study of girder deflections during bridge deck construction : final report.

Filetype[PDF-8.51 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
English

Details:

  • Creators:
  • Corporate Creators:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    Problems involved in obtaining the desired thickness of bridge decks were investigated. The study, which was limited to decks which were longitudinally screeded during construction, included (1) field measurements of the girder deflections during construction, and (2) a theoretical frame analysis of the girder deflections under the field loading conditions. Each of the two spans investigated were simply supported steel plate girder designs. When full span length longitudinal screeding is used, the finished grade elevations are set on the screeding edge of the machine, and remain independent of the bridge girder deflections during deck placement. Consequently, any factor affecting the girder deflections, and thus the forming elevations, will, in turn have bearing on the final thickness of a bridge deck. In addition, all factors which, in effect, cause the deck forming to be too high at the time the concrete is screeded to grade have the potential of causing a shy deck thickness. The most significant factors were found to be: (1) Plan dead load deflection values which are in error, (2) the differential temperatures existing between the top and bottom flanges of the girders during concrete placement as opposed to those that may have existed when the forming elevations were established, and (3) the transverse position of the concrete dead loading at the time a final screeding pass is made over a given point on a span. Based on the results of the study, certain recommendations are offered regarding the computation of dead load deflections and precautions to be observed during construction when longitudinal screeding of the concrete deck is used.
  • Format:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov