Welcome to ROSA P |
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.
  • Published Date:
    2010-05-01
  • Language:
    English
Filetype[PDF-4.29 MB]


Details:
  • Alternative Title:
    Transportation conformity analysis : draft report ; 8-hour ozone maintenance area transportation conformity analysis : draft report ; Eight-hour ozone maintenance area transportation conformity analysis : draft report ; 2031 long range transportation plan and FY 09-12 transportation improvement program : draft report ;
  • Resource Type:
  • Geographical Coverage:
  • OCLC Number:
    682920160
  • Edition:
    Draft report.
  • NTL Classification:
    NTL-ENERGY AND ENVIRONMENT-Air Quality ; NTL-ENERGY AND ENVIRONMENT-Environment Impacts ; NTL-PLANNING AND POLICY-PLANNING AND POLICY ;
  • Abstract:
    This report presents the regional conformity analysis and recommendation for a finding

    of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or

    "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement

    Program (TIP, or "Program"), both as amended by the Hampton Roads Transportation

    Planning Organization (HRTPO). The HRTPO serves as the designated Metropolitan

    Planning Organization or MPO for the Hampton Roads region1. This analysis was

    conducted in compliance with the federal transportation conformity rule (40 CFR Parts

    51 and 93) and the corresponding state conformity regulation (9 VAC 5-151).

  • Format:
  • Main Document Checksum:
  • Supporting Files:
    No Additional Files
No Related Documents.
You May Also Like:
Submit Feedback >