Integration of utility and environmental activities in the project development process.
-
2010-01-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Technical report; Sept. 2007-Aug. 2009.
-
Corporate Publisher:
-
Abstract:Two sources of delay during the project development process are utility adjustments and the environmental ; review and clearance process. There are several efforts underway at the Texas Department of Transportation ; (TxDOT) to optimize these processes, including recently finished and active research projects. Despite these ; efforts, the interaction between the utility process and the environmental process is one that has not received ; proper attention over the years. One of the reasons is that, although the collection of data about existing and ; abandoned utility installations is part of the environmental data gathering process, in practice the collection ; of detailed underground utility-related data normally starts in the design phase, which typically occurs after ; the environmental process is complete. ; The purpose of the research was to evaluate the feasibility of (a) obtaining better existing utility data during ; preliminary design and coordinating this activity with the environmental process; and (b) increasing the level ; of definition of design components during preliminary design without affecting environmental requirements ; to support the earlier application of utility processes. The analysis resulted in 10 optimization strategies that ; address a variety of environmental and utility issues identified through a literature review and meetings with ; stakeholders throughout the state. The researchers also developed a high detailed business process diagram ; that integrates environmental and utility functions, with a specific emphasis on the preliminary design phase. ; To facilitate access to model information, the researchers developed a web-based application called TxDOT ; Business Process Explorer (TxBPE). TxBPE can be accessed on the Internet, the TxDOT intranet, or from a ; local or networked computer drive.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:802802211e6335e9db1f7bd2d4a3ab49124cd4d12ca491ea413220b88a1eee52