U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Integration of utility and environmental activities in the project development process.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Technical report; Sept. 2007-Aug. 2009.
  • Corporate Publisher:
  • Abstract:
    Two sources of delay during the project development process are utility adjustments and the environmental

    review and clearance process. There are several efforts underway at the Texas Department of Transportation

    (TxDOT) to optimize these processes, including recently finished and active research projects. Despite these

    efforts, the interaction between the utility process and the environmental process is one that has not received

    proper attention over the years. One of the reasons is that, although the collection of data about existing and

    abandoned utility installations is part of the environmental data gathering process, in practice the collection

    of detailed underground utility-related data normally starts in the design phase, which typically occurs after

    the environmental process is complete.

    The purpose of the research was to evaluate the feasibility of (a) obtaining better existing utility data during

    preliminary design and coordinating this activity with the environmental process; and (b) increasing the level

    of definition of design components during preliminary design without affecting environmental requirements

    to support the earlier application of utility processes. The analysis resulted in 10 optimization strategies that

    address a variety of environmental and utility issues identified through a literature review and meetings with

    stakeholders throughout the state. The researchers also developed a high detailed business process diagram

    that integrates environmental and utility functions, with a specific emphasis on the preliminary design phase.

    To facilitate access to model information, the researchers developed a web-based application called TxDOT

    Business Process Explorer (TxBPE). TxBPE can be accessed on the Internet, the TxDOT intranet, or from a

    local or networked computer drive.

  • Format:
    PDF
  • Funding:
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:802802211e6335e9db1f7bd2d4a3ab49124cd4d12ca491ea413220b88a1eee52
  • Download URL:
  • File Type:
    Filetype[PDF - 4.83 MB ]
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.