U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Integration of utility and environmental activities in the project development process.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Technical report; Sept. 2007-Aug. 2009.
  • Corporate Publisher:
  • Abstract:
    Two sources of delay during the project development process are utility adjustments and the environmental ; review and clearance process. There are several efforts underway at the Texas Department of Transportation ; (TxDOT) to optimize these processes, including recently finished and active research projects. Despite these ; efforts, the interaction between the utility process and the environmental process is one that has not received ; proper attention over the years. One of the reasons is that, although the collection of data about existing and ; abandoned utility installations is part of the environmental data gathering process, in practice the collection ; of detailed underground utility-related data normally starts in the design phase, which typically occurs after ; the environmental process is complete. ; The purpose of the research was to evaluate the feasibility of (a) obtaining better existing utility data during ; preliminary design and coordinating this activity with the environmental process; and (b) increasing the level ; of definition of design components during preliminary design without affecting environmental requirements ; to support the earlier application of utility processes. The analysis resulted in 10 optimization strategies that ; address a variety of environmental and utility issues identified through a literature review and meetings with ; stakeholders throughout the state. The researchers also developed a high detailed business process diagram ; that integrates environmental and utility functions, with a specific emphasis on the preliminary design phase. ; To facilitate access to model information, the researchers developed a web-based application called TxDOT ; Business Process Explorer (TxBPE). TxBPE can be accessed on the Internet, the TxDOT intranet, or from a ; local or networked computer drive.
  • Format:
    PDF
  • Funding:
  • Download URL:
  • File Type:
    Filetype[PDF - 4.83 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:802802211e6335e9db1f7bd2d4a3ab49124cd4d12ca491ea413220b88a1eee52
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.