Task acceptability and workload of driving city streets, rural roads, and expressways : ratings from video clips.
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Task acceptability and workload of driving city streets, rural roads, and expressways : ratings from video clips.

Filetype[PDF-2.94 MB]


English

Details:

  • Alternative Title:
    SAfety VEhicles using adaptive interface technology (SAVE-IT project) : task 2C, develop and validate equations
  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    Subjects rated the workload of clips of forward road scenes (from the advanced collision avoidance system (ACAS) field operational test) in relation to 2 anchor clips of Level of Service (LOS) A and E (light and heavy traffic), and indicated if they would perform any of 3 tasks (dial a phone, manually tune a radio, enter a destination) in driving the scenes shown. After rating all of the clips, subjects rated a wider range of described situations (not shown in clips) and the relative contribution of road geometry, traffic, and other factors to workload. Using logistic regression, predictive equations for the refusal to engage in the 3 tasks were developed as a function of workload, driver age, and sex. Several equations were developed relating real-time driving statistics with workload, where workload was rated on a scale of 1 (minimum) to 10 (maximum). Some 87% of the rating variance was accounted for by the following expression: Mean Workload Rating=8.87-3.01(LogMeanRange)+ 0.48(MeanTrafficCount)+ 2.05(MeanLongitudinalAccleration), where range (to the lead vehicle) and traffic count were both determined by the adaptive cruise control radar. Other estimates were also generated from post-test ratings and adjustments, considering factors such as construction zones, lane drops, curves, and hills. From the results of this report alone, the workload estimates needed by a real-time workload manager could be developed using (1) the real time data, (2) look-up tables based on the clip ratings, (3) look-up tables based on the post-test data, or (4) some combination of those 3 sources.
  • Format:
  • Funding:
  • Collection(s):
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at rosap.ntl.bts.gov