Release 1.0 System Integration Test Report
-
1996-05-23
Details
-
Corporate Creators:
-
Subject/TRT Terms:
-
DOI:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The purpose of this report is to present the findings of the System Integration Test Team which relates to the compliance with the C-TIC Release 1.0 requirements. This report summarizes the tests performed, the procedures and any comments related to the outcome of testing. Testing was performed Monday through Friday during regular working hours, or when most convenient for the system, during the three week period from March 28, 1996 through April 18, 1996. The System Integration Test Report has the goal of providing documentation of the test results and to verify which Release 1.0 requirements were met. Deficiency reports were written and submitted on those that were not met and scheduled to be corrected in a timely fashion.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:a1af7e02d3fb73474d92a54d73a7370f6eb0e61ae72944c287b801295345c6b1d9b1bcb88b8b36bc9390ec8d8a013697d1f2700f5c5001047fac3d129e891eb1
-
Download URL:
-
File Type: