Transportation Analysis and Simulation System Requirements
-
1973-04-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Preliminary memorandum
-
Corporate Publisher:
-
Abstract:This document provides:
a. A brief summary of overall project (PPA OS223) accomplishments during FY 72.
b. A detailed summary of the following two major FY 72 activities:
1. Analysis of TSC's computation resources and their utilization;
2. Projection of TSC's FY 77 computational system demands.
Section 1 provides an overview of the project, including reasons for the project, its objectives and history, and the status at the close of FY 72. Section 2 presents the growth strategy of TSC and the projected scope of program activity in FY 77. Section 3 addresses the present TSC computer system resources and their utilizaton. Section 4 describes the methodology used to project FY 77 computer system demands and presents the results of the projection process.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: