Neat, G. W. (1973). MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots (Report No. DOT-TSC-UMTA-73-09, II). United States. Urban Mass Transportation Administration. https://doi.org/10.21949/1526695
Neat, George W.. MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots. Report no. DOT-TSC-UMTA-73-09, II. United States. Urban Mass Transportation Administration, 1973. https://doi.org/10.21949/1526695.
Neat, George W. MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots. United States. Urban Mass Transportation Administration, 1973, Report no. DOT-TSC-UMTA-73-09, II, ROSA P. https://doi.org/10.21949/1526695.
The Urban Rail Supporting Technology Program emphasizes three major task areas: facilities development, technology development, and test program development. The test program development is composed of three sub-areas: vehicle testing, ways and structures testing, and track geometry measurement. The report presents the technical methodology, data samples, and results of tests conducted on the Massachusetts Bay Transit Authority (MBTA) Green Line in December 1972 prior to initiation of the Green Line refurbishment effort. An instrumented revenue type car was used for the measurement of track geometry, ride roughness, and interior noise. Actual car speed was approximately the same as normal revenue speed. The objectives of the tests were to identify critical track sections for improvement to quantify the benefits produced by the track rehabilitation program, and to provide data for Transportation Systems Center's development of an advanced track geometry measurement system. Volume II presents track geometry analog data plots for the complete length of track.
Neat, G. W. (1973). MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots (Report No. DOT-TSC-UMTA-73-09, II). United States. Urban Mass Transportation Administration. https://doi.org/10.21949/1526695
Neat, George W.. MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots. Report no. DOT-TSC-UMTA-73-09, II. United States. Urban Mass Transportation Administration, 1973. https://doi.org/10.21949/1526695.
Neat, George W. MBTA Green Line Tests - Riverside Line, December 1972: Volume II. Track Geometry Data Plots. United States. Urban Mass Transportation Administration, 1973, Report no. DOT-TSC-UMTA-73-09, II, ROSA P. https://doi.org/10.21949/1526695.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.