Sum of PrePourNC jobnumber
NC TYPE 31417 31421 31429 32403 32411 32415 32416 33401 33404 33405 33406 33407 82405 82406 Grand Total Percentage
Battered/ Skewed/ Blowout             1 0   0         1 0.06%
Bowed   2 2 0.11%
Chipped   2 2 0.11%
Clearance / Touching   12 1 34 47 2.62%
Crooked   2 2 0.11%
C-ties missing/missplaced   1 3 4 0.22%
Damaged   2 0 0 2 0.11%
Dented   1 1 0.06%
Dirty   5 3 4 9 1 2 24 1.34%
Excessive Oil   1 2 3 0.17%
Improper Depth   0 0 0 3 1 3 7 0.39%
Improper Dunnage   0 0 0.00%
Improper Finish   0 0 0.00%
Improper Projection   0 0 0 0.00%
INCORRECT QTY   2 2 4 0.22%
Loose 1 11 15 1 6 12 7 18 71 3.96%
Mislocated/Misaligned 8 29 412 1 0 26 22 62 20 145 0 11 1 737 41.13%
Missing 14 46 199 22 9 29 17 60 12 0 408 22.77%
Not Cut Back   6 1 7 0.39%
Obstructed   0 0 1 1 0.06%
Other 6 16 76 21 11 17 23 2 2 0 0 174 9.71%
Out Of Sq.   2 2 1 5 0.28%
Projection   3 2 0 5 0.28%
Recess 0 0 2 0 0 0 2 0 4 0.22%
Rotated   3 11 14 0.78%
Suspended Pre-check   2 10 3 7 22 1.23%
Tipped 0 0 3 0 0 1 0 7 0 11 0.61%
Touching Form 1 5 57 5 9 4 81 4.52%
Upside Down   6 6 0.33%
Wrong Length   1 6 0 4 1 12 0.67%
Wrong Plate   4 4 8 0.45%
Wrong Size   3 45 27 5 80 4.46%
Wrong Spacing   1 1 0.06%
Wrong Splice   1 1 0.06%
Wrong Type   6 2 2 1 11 0.61%
Wrong Width 0 9 6 0 0 3 14 2 34 1.90%
Grand Total 30 143 865 1 0 79 71 136 51 361 9 41 0 5 1792