Central Texas Airport: Feasibility Study Site Selection Study
-
2003-07-01
Details:
-
Alternative Title:Central Texas airport : site selection study;Central Texas airport-phase 1 : feasibility study;Airport master plan;Environmental assessment;
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-AVIATION-Airports and Facilities
-
Abstract:The purpose of this study is to study the feasibility of, and determine the best location for, a new general aviation airport in the Austin area. The general area being considered for the siting of a new airport is Travis County and the six contiguous counties. If a suitable site is selected, an airport master plan and environmental assessment will be prepared. The study?s four phases are anticipated to take approximately 18 months to complete. This website shows the area under study and outlines the four phases. At time of review, phase one, the feasibility study was on line.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +