Surface Transportation Weather Decision Support Requirements: Preliminary Interface Requirements: Draft Version 2.0
Details:
-
Alternative Title:Surface transportation weather decision support requirements : preliminary interface requirements : advanced-integrated decision support using weather information for surface transportation decisions makers : draft version 2.0
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
TRIS Online Accession Number:00810201
-
Corporate Publisher:
-
NTL Classification:NTL-INTELLIGENT TRANSPORTATION SYSTEMS-Road Weather Management;NTL-INTELLIGENT TRANSPORTATION SYSTEMS-INTELLIGENT TRANSPORTATION SYSTEMS;
-
Abstract:This Preliminary Interface Requirements (PIR) is a draft document for the Surface Transportation Weather Decision Support Requirements (STWDSR) project. The STWDSR project is being conducted by Mitretek Systems, Inc., for the Federal Highway Administration (FHWA) Office of Transportation Operations (HOTO) Road Weather Management Program. The PIR complements the STWDSR Operational Concept Description (OCD) document, and both documents together constitute the STWDSR version 2.0 (V2.0) deliverable. The PIR defines requirements on the external information sources for the winter road maintenance decision support functions described in the OCD
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +