Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Performance-Based Contractor Prequalification as an Alternative to Performance Bonds

Filetype[PDF-2.67 MB]


  • English

  • Details:

    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      State departments of transportation rely on private industry construction contractors to build, rehabilitate, and replace their infrastructure assets. The Federal Highway Administration (FHWA) is interested in providing guidance that State transportation departments can use to select contractors that can complete projects cost-effectively. One potential method to help select qualified contractors is to use a performance-based contractor prequalification process. FHWA commissioned this study to evaluate the wisdom of expanding the use of this process. This report presents the results of this study, which examined relevant literature, evaluated the benefits and costs of performance bonds and performance-based contractor prequalification, and recommended a model performance-based prequalification approach. In the highway industry, one of the main methods to prequalify a contractor is determine whether or not a performance bond can be secured. The current performance bonding system does not differentiate between a high performing and marginally performing contractor, so long as the two companies have the same level of financial assets. This gives both companies the same opportunity to bid on a project, regardless of performance. In a low-bid environment, it creates a situation where a State transportation department subsidizes marginal performance, which, in turn, reduces the incentive for top performers to continue superior performance. This research project analyzes the benefits and costs of performance bonds and performance-based contractor prequalification and creates a performance-based contractor prequalification model. Through a detailed literature review; surveys of contractors, State transportation departments, and sureties; and State transportation department case studies, the research suggests that the default rate for the industry is less than 1 percent, the minimum contract value that requires a performance bond should be raised to between $1 million and $10 million, and the cost of performance-based prequalification is low compared to the cost of performance-bonds. Last, a three-tiered performance-based contractor prequalification model is presented.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26