Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
TRIS Online Accession Number:01671022
-
Edition:Final Research Project Report
-
Corporate Publisher:
-
Abstract:This project developed a low cost building energy management system (EMS) and conducted vehicle-to-grid (V2G) experiments on a commercial office building. The V2G effort included the installation and operation of a Princeton Power System CA-30 bi-directional power system. These experiments targeted the reduction of utility peak electrical demand for a commercial office building. In each case, total building peak demand was managed through a computer algorithm to limit the charging rate of electric vehicles or used the vehicle’s on-board traction battery as a storage device to minimize peak electrical loads.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +