Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Accelerated Innovation Deployment (AID) Demonstration : KYTC—Roundabout Installation Project in London, Kentucky.

Filetype[PDF-4.03 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Design
    • Abstract:
      This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11‐904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority of the Kentucky Transportation Cabinet (KYTC), which received an Accelerated Innovation Deployment (AID) Demonstration grant of $1 million to offset project construction costs. The AID Demonstration program requires that award recipients submit a final report to the Federal Highway Administration (FHWA) within six months of project completion. The purpose of this report is to document the project delivery and construction processes, benefits, and lessons learned, which includes development and/or refinement of guidance, specifications, or other tools and methods that could be used to adopt the roundabout innovation as standard practice. At the beginning of the project, a Data Collection and Implementation (DC&I) plan was created to guide this study on the London Roundabout’s construction. The research team specified performance indicators and individual project goals to help work toward best practices and to measure the project's performance, with particular focus on the relevant outcomes that were achieved through the use of the innovation (i.e., the modern roundabout intersection).
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26