Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Turbidity monitoring at select MDOT construction sites.

Filetype[PDF-31.52 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      The objective of this project was to establish baseline turbidity conditions at select construction

      sites by establishing a water quality monitoring program and documenting MDOT approved

      BMPs on site. In 2009 the United States Environmental Protection Agency (EPA) proposed a

      numeric turbidity limit for stormwater runoff at construction sites. The proposed limit of 280

      NTUs was stayed due to a miscalculation, and EPA has not released a new numeric limit for

      turbidity. Current Mississippi Department of Environmental (MDEQ) Water Quality Standards

      (WQS) require that turbidity 750 feet downstream from the point of discharge not exceed the

      background turbidity levels upstream of the discharge point buy 50 NTU. MDOT has no method

      of evaluation in place to measure turbidity at construction sites; and therefore, no background

      data are available to indicate how current erosion and sedimentation BMPs are performing with

      respect to potential increases in turbidity. Methods of analysis used in this report included the

      collection of turbidity data from seven sites where MDOT construction posed a potential threat

      to waters of the state. Prospective sites had to meet certain criteria in order to be used for the

      study.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26