Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Streamlining project delivery through risk analysis.

Filetype[PDF-2.97 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      Project delivery is a significant area of concern and is subject to several risks throughout Plan Development

      Process (PDP). These risks are attributed to major areas of project development, such as environmental

      analysis, right-of-way (ROW) acquisition, utilities coordination, third-party agreements, etc. The major

      challenge for GDOT is that the risks can negatively impact the project outcomes as cost overrun and schedule

      delay. However, if these risks could be identified early in the concept and scope development processes, their

      respective negative impacts on project outcomes could be reduced. The research objective of this study is to

      develop a comprehensive guidebook that advances the adoption of risk analysis tools in GDOT, in order to

      expedite project delivery. To achieve the research objective, various project risk management processes

      developed by different organizations were reviewed. Furthermore, current practice of risk management in

      different state DOTs were studied. Several state DOTs were surveyed and interviewed regarding their risk

      management programs. The results indicate that typically state DOTs determine the level and methods of risk

      management based on project size and complexity of the project. The level of risk management may vary from

      a simple risk register to a complex quantitative analysis. Then, a semi-structured interview was conducted with

      nine subject matter experts at GDOT. The key factors that influence risk management practices within GDOT

      were explored. The results were analyzed and a model explaining the current risk management practice and

      future needs was developed. A comprehensive list of potential risks for transportation projects was developed

      based on reviewing the academic/professional literature, current state of practice in risk management among

      leading state DOTs, and current state of practice of GDOT. During several meetings with higher level risk

      management experts at GDOT, the most important risks were indented and a short list of major potential risks

      was developed for each office at GDOT. Finally, a software tool specifically designed for identification and

      qualitative assessment of highway project risks during the pre-construction phase of the project was developed

      based on the shortlisted risk factors. The software program is equipped with the modification capability of

      adding new risk items and/or removing some of the predetermined risk factors from the assessment.