Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Seal coat productivity.

Filetype[PDF-15.07 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      The Indiana Department of Transportation (INDOT) conducts chip seal operations on state highways to prolong the life of the road. The 

      chip seal operation is labor, equipment and material intensive. A typical chip seal operation may involve 35 or more INDOT employees 

      including truck drivers, flagmen, and equipment operators (brooms, rollers, aggregate spreader, and distributors). 

      This project was launched to better understand and document variations in how each of the six INDOT districts, approach the 

      planning and execution of their respective  chip seal operations. The goal was to identify areas in the operation where there were 

      differences between districts and to determine best practices that could be shared among the districts. 

      Two observers joined the chip seal operations in all six districts. The observers spent a total of 10 days with the chip seal crews (2 

      days each with the crews from Fort Wayne, La Porte, Greenfield, and Seymour and 1 day each with the crews from Vincennes and 

      Crawfordsville). One additional day was spent in Crawfordsville observing the Fog Seal operation that takes place a few days following 

      chip seal. 

      During the initial phases of this project, many differences were observed regarding various aspects of the operation including the 

      stone and equipment used, truck loading procedures, traffic control, and covering raised pavement markers (RPNs).  

      These observations were shared with key stakeholders on November 4, 2013 and with a second group of stakeholders on January 

      22, 2014. With the help of stakeholders, best practices were identified from the observations and a list of 14 recommendations was 

      created to be shared across all districts. A series of meetings were then scheduled to share the recommendations with each district and 

      to determine which recommendations they were interested in piloting. 

      The three ideas found during this project that provide the greatest opportunities for improving the overall operational efficiency of 

      the chip seal operation are (1) the importance of closing roads during chip seal whenever possible, (2) the importance of choosing the 

      best locations for stone stockpiles and oil tanker deliveries, and (3) the importance of fully loading dump trucks to their maximum safe 

      and legal limit.

    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26