Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Costs and revenues associated with overweight trucks in Indiana.

Filetype[PDF-44.98 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      This study estimated highway pavement and bridge damage costs, and analyzed the adequacy of permit revenues to cover these

      costs. The study began with an extensive review of the literature on the subject, thus facilitating identification of the gaps in the

      existing practice and research. The developed framework includes the establishment of asset families, realistic types and timings of

      reconstruction, rehabilitation, and maintenance, traffic volumes and growth projections. The cost of damage was estimated for

      each asset family and age group, and the sensitivity of asset damage cost with respect to key policy and analysis variables was

      explored. Finally, the study examined cost and operational issues associated with the enforcement of overweight truck policies. In

      addressing the gaps in existing research, this study showed that the damage cost of highway assets due to overweight trucks is

      influenced significantly by the asset type and age. For pavement assets, the pavement damage cost estimates were found to range

      from $0.006 per ESAL‐mile on Interstates to $0.218 per ESAL‐mile on non‐national highways. The study also showed that nonconsideration

      of reconstruction or maintenance cost can result in underestimation of the actual pavement damage cost by 79% and

      83%, respectively. The analysis also showed that the unrealistic approach of considering only rehabilitation treatments applied at

      fixed intervals can lead to as much as 86% underestimation of the actual pavement damage cost. The results also suggest that

      pavement damage cost is highly sensitive to the pavement life‐cycle length, interest rate, rest period, and the costs and service lives

      of rehabilitation treatments. For the bridge assets (classified on the basis of their superstructure material type), the incremental

      methodology was found to be suitable to estimate the cost of bridge damage due to overweight vehicles. This methodology

      determines and assigns bridge damage cost to all vehicle classes on the basis of vehicle axle configurations and usage frequency

      (vehicle‐miles travelled). Incremental designs were carried out and cost functions were developed using AASHTO’s design vehicles.

      Each FHWA vehicle weight group was classified into an equivalent AASHTO loading regime using the modified equivalent vehicle

      (MEV) model which is based on gross vehicle weight, axle loading and axle spacing. The results were used to incrementally assign

      bridge cost to each vehicle class. For each class of overweight vehicles, the bridge damage cost was computed as the ratio of the

      cost responsibility and the volume of these vehicles. The bridge damage cost was estimated under two permit fee options and

      three user charging scenarios. The results suggest that approximately 22% of total bridge cost can be considered attributable to

      overweight vehicles. Also, it was observed that the bridge damage cost is not just a factor of gross vehicle weight but a function of

      all the three vehicle‐related variables: gross vehicle weight, axle spacing and axle loads. It was concluded that the adoption of a

      permit structure on the basis of gross vehicle weight only, will result in certain vehicle classes underpaying by as much as 92% of

      their actual contribution to bridge damage. Finally, the study examined cost and operational issues associated with the

      enforcement of overweight truck policies and identified a number of locations that could be considered for establishing new weigh

      stations and other enforcement facilities.

    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26