Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Review of road user costs and methods.

Filetype[PDF-1.72 MB]


  • English

  • Details:

    • Corporate Contributors:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-HIGHWAY/ROAD TRANSPORTATION;NTL-ECONOMICS AND FINANCE-ECONOMICS AND FINANCE;
    • Abstract:
      The South Dakota Department of Transportation (SDDOT) uses road user costs (RUC) to calculate incentive or disincentive compensation for contractors, quantify project-specific liquidated damages, select the ideal sequencing of a project, and forecast the long-term effects new construction will have on the traveling public. The current RUC calculations were initially set in 1996 by research project SD1995-07 Criteria and Guidelines for Innovative Contracting; they have undergone little updating aside from unit cost values. Since the last research project, the two offices (Project Development and Operations Support) that depend on RUC have updated these values to keep up with inflation, but have done so independently. Currently, they use different worksheets with similar fields, but the values used to calculate RUC are substantially different.

      Maintaining the most up-to-date RUC is extremely important to SDDOT, as underestimation of RUC results in increased costs to the traveling public, while overestimation results in the SDDOT overpaying on incentives for early completion of construction projects. Obtaining proper RUC also helps to justify the deployment of new technologies that can accelerate the construction process for pavement and bridges and strengthen the economic competitiveness of SD in the region. Calculated RUC in South Dakota are currently much lower than those of surrounding states, in part due to infrequent updates. As a result, South Dakota construction projects may be given a lower priority compared with projects managed by the same contractor in surrounding states that have greater incentive/disincentive values. The subsequent impacts to South Dakota road users include extended construction periods, prolonged traveler delays, compromised safety, and inconvenience.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26