Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Rapid replacement/construction of bridges.

Filetype[PDF-3.36 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Bridges and Structures;NTL-HIGHWAY/ROAD TRANSPORTATION-Construction and Maintenance;NTL-HIGHWAY/ROAD TRANSPORTATION-Design;
    • Abstract:
      Bridges are a key element of the transportation system because they control system capacity and are normally built at

      the highest cost to the system. Once a bridge reaches its useful design service life, it needs to be replaced or

      reconstructed in order to safely accommodate traffic and efficiently utilize the system. While highways can be repaired

      relatively quickly, bridges require special planning, engineering, materials procurement, and longer periods of

      construction time. This study synthesized current state-of-practices of rapid bridge construction methods, developed a

      decision-making framework for determining the feasibility of adopting rapid bridge replacement/construction, that

      considers issues of criticality of the bridge, contractor’s prefabrication ability, contractor’s construction management,

      and agency and user costs of bridge construction. The findings provide highway agencies with a framework to determine

      whether it is appropriate to utilize rapid bridge replacement/construction techniques for specific bridges. Based on these

      findings, a decision support framework using Analytical Hierarchy Process (AHP) is presented to allow for agencies to

      rank order priorities amongst those assets (bridges) that are determined to be candidates for rapid

      replacement/construction. Finally, a preliminary analysis was performed to explore a conceptually new bridge design

      and construction system that may be considered as a candidate for rapid replacement/construction of bridges with

      similar geometric design standards governed by comparable traffic conditions and site characteristics.

      Major technical issues addressed in this study include: 1) identifying existing literature on rapid bridge

      replacement/construction techniques developed worldwide; 2) finding current state-of-practices of rapid bridge

      replacement/construction in the United States; 3) developing a decision-making procedure for justifying the use of rapid

      bridge replacement/construction techniques over the conventional bridge construction methods; and 4) exploring a new

      conceptual bridge design and construction system that supports rapid construction. This report provides both technical

      and non-technical information. Some readers may wish to skip over the analysis details and focus on broader concepts of

      the analysis strategy.

    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26