Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Performance-based specifications for temporary erosion and sediment control during construction : a survey of state practice.

Filetype[PDF-126.62 KB]


  • English

  • Details:

    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • NTL Classification:
      NTL-HIGHWAY/ROAD TRANSPORTATION-Soils and Geology;NTL-PLANNING AND POLICY-PLANNING AND POLICY;NTL-PLANNING AND POLICY-Surveys;
    • Abstract:
      During construction projects, surrounding soils can be disrupted, causing ecological damage through topsoil erosion and pollution of waterways with sediment. MnDOT currently has requirements and inspection procedures to ensure that contractors take measures, typically referred to as best management practices (BMPs), to control this erosion and sediment. Compliance is financially assured via a lump sum payment: Contractors who follow the requirements get paid upon completion of work according to specifications.

      MnDOT is looking into the prospect of applying more innovative modes of contracting to manage this process. Performance-based specifications would provide rewards for outcomes instead of for simply following MnDOT-required procedures. Contractors could apply new techniques and technologies to address this problem at their own initiative, encouraging faster applications of innovation and making management simpler for MnDOT while granting contractors more discretion.

      We surveyed other state departments of transportation to assess their experience with performance-based specifications in this area. As part of the survey, we requested guidance for configuring specifications and contract mechanisms, communicating with contractors about erosion and sediment control, and determining whether requirements have been met.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26