Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

How can innovative project delivery systems improve the overall efficiency of GDOT in transportation project delivery?

Filetype[PDF-5.51 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Abstract:
      The USDOT and Federal Highway Administration (FHWA) recommend the smart use of innovative project

      delivery systems, such as design-build, to improve efficiency and effectiveness of developing transportation

      projects. Although design-build provides state DOTs with accelerated delivery and innovations in design and

      construction, there is still a need to accelerate delivery of design-build projects and achieve higher level of

      efficiency. To fully utilize the entire potential benefits of the design-build project delivery system, state DOTs are

      required to overcome significant challenges in various critical areas of the project development process including

      project delivery system selection, procurement, environmental analysis and permitting, right-of-way (ROW)

      acquisition, utilities coordination and relocation, alternative technical concepts (ATCs), and design oversight,

      design acceptance, and quality management. The overall objective of this research project is to develop a

      guidebook for the Georgia DOT (GDOT) to identify major challenges in the critical areas of the project

      development process, determine opportunities to overcome these challenges, and describe potential best practices

      to enhance the efficiency of project development process for highway design-build projects. The findings of

      design-build review and scanning process, and the results of interviewing design-build programs in 7 state DOTs

      helped the research team identify various issues related to efficient delivery of design-build projects in the seven

      critical areas. The primary findings of this study are categorized under these critical areas. Each area begins with

      clear description of the new dynamics of design-build and follows with critical challenges and issues to enhance

      the efficiency of delivery processes. These challenges relate to a variety of legal and statutory barriers or issues

      that can delay the project delivery schedule, increase the project delivery cost, and hinder flexibility of the designbuild team to implement innovative design and construction solutions. Furthermore, the analysis for each area

      presents efficiency enhancement opportunities as a set of propositions that recommend appropriate strategies for

      implementation. Examples of actual design-build projects are provided along with references from project

      RFQs/RFPs, design-build guides and manuals, and professional and academic literature for further clarification of

      challenges that can happen during development of design-build projects and strategies to overcome the challenges.

    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26