Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

A surface treatment management system.

Filetype[PDF-1.43 MB]


  • English

  • Details:

    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Final report.
    • Abstract:
      A brief survey presented in this report illustrates the variability in management practices for the surface treatment of secondary roads across the country. In Virginia, an informal process that uses the experience of field engineers working within budgetary limitations has evolved. This has resulted in a cyclic resurfacing approach. As a general rule, Virginia's surface-treated secondary roads are resurfaced every 5 years. Although attempts during this project to establish a detailed project level management system for Virginia's surface-treated secondaries were unsuccessful, a viable economic analysis program has been established to analyze the costs of a particular resealing cycle for use in comparing various cycles. This program includes a function that models the effects of delaying resurfacing with an increase in required ordinary maintenance. Using the developed computer spreadsheet to analyze Virginia's alternatives led to the finding that a 4-year resealing cycle was optimal with a 5-year cycle only 1 percent higher. Unfortunately, since many assumptions were made and many cost estimates used, it is not surprising that a 4- or 5-year cycle was selected-Virginia currently uses a 5-year cycle. However, the analysis program is sound and may prove to be quite useful at the network level to other states that have much better cost and condition data.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26