Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

TxDOT synthesis of the construction inspection workload reduction strategies.

Filetype[PDF-1.26 MB]


  • English

  • Details:

    • Alternative Title:
      Synthesis study of programs used to reduce the need for inpsection personnel
    • Publication/ Report Number:
    • Resource Type:
    • Abstract:
      An increase in transportation budgets the past two decades and a consequent movement toward more

      outsourcing of DOT activities can be significantly attributed to two historic events. The 1998

      authorization of the Transportation Equity Act of the 21st Century (TEA-21), which resulted in an

      average increase in state funding of more than 44% in transportation programs. The subsequent

      authorization of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for

      Users (SAFETEA-LU) in 2005, which extended and expanded the TEA-21 (Warne 2003). As a result,

      DOTs were able to complete projects that would have not been feasible without the additional funding.

      While these additional projects will decrease congestion and increase transportation safety, the DOTs

      have not seen a sufficient increase in personnel to manage the additional work. Consequently, TxDOT

      and other state DOTs are addressing their workforce challenges by outsourcing key project

      responsibilities that were previously performed by in-house DOT forces and adapting their practices to

      perform construction administration more efficiently.

      TxDOTā€™s Construction Division and the district construction departments have a shortage of skilled

      inspectors and that is impacting TxDOTā€™s ability to efficiently manage its QC/QA workload, as

      suggested by anecdotal evidence. Several large highway projects, especially in the urban areas, where

      contractors are working six or seven days each week, result in construction inspectors working overtime

      in order to inspect the work as it is completed. Long-term overtime is a known cause of fatigue (Hanna

      2005), and labor laws typically limit the number of consecutive days that a person can work. As a result,

      the district personnel have had considerable difficulty meeting the inspection needs and requirements,

      especially because state DOTs have difficulty recruiting and retaining experienced and well qualified

      inspection personnel. The situation is further complicated with the increase in complexity of

      transportation construction projects.

      TxDOT faces significant workforce challenges, particularly in the districts, where the testing and

      inspection workload is increasing but the workforce is decreasing. As a result of these workforce

      challenges, TxDOT is looking for more effective ways to manage their testing, inspection, and

      measurement workload. They are looking to other DOTs from which they believe much can be learned.

      Other states are facing similar workforce challenges and have taken actions to implement procedures to

      reduce their construction inspection workload. Such procedures include increasing contractor testing and

      inspection responsibilities, outsourcing testing and inspection to third parties, creating extensive training

      and certification programs, and modifying their specifications to minimize time intensive testing and

      measurement. Accordingly, there is a need to summarize the best practices from those state DOTs that

      have already instituted successful programs to reduce the QC/QA workload that could potentially aid

      TxDOT in addressing their specific workload challenges. This project summarized TxDOTā€™s current

      workload challenges, identified successful workload reduction strategies that have been implemented in

      other state DOTs, compared TxDOTā€™s challenges and practices to the other statesā€™ challenges and

      practices, and lastly prioritized the workload reduction strategies implemented in other states that could

      be applied to manage TxDOTā€™s workforce challenges.