Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

A cost evaluation of cross-border truck emissions testing using heavy duty remote sensing equipment : final report 601.

Filetype[PDF-2.42 MB]


  • English

  • Details:

    • Creators:
    • Corporate Creators:
    • Publication/ Report Number:
    • Resource Type:
    • Geographical Coverage:
    • Edition:
      Final report
    • Abstract:
      The objective of this research study was to perform a thorough evaluation of the feasibility and cost implications for initial system installation and ongoing program and maintenance costs for a land port of entry truck emissions program utilizing heavy duty remote sensing technology. This study includes funding recommendations to maintain such a program. To meet the study objective, project tasks included the following: 1) develop a work plan for approval by the Technical Advisory Committee; 2) review the literature on cross-border truck traffic, truck emissions, and truck emission testing; 3) prepare a detailed data collection plan; 4) implement the data collection plan and provide detailed discussion and analysis to support the proposed testing program's elements and cost components; and 5) prepare a final report and a four-page research note. Cost data were developed for each alternative and includes figures for capital equipment installation and five years of operation and maintenance expenses. The present worth costs for each data plan utilizing contract labor ranged from $1,320,828 to $2,177,467. If employees of the Arizona Department of Transportation (ADOT) or the Arizona Department of Environmental Quality (ADEQ) are used, the present worth costs range between $1,140,349 and $1,923,247. While it is obvious that the use of employees is less expensive than contract labor, the agency could find it difficult to attract highly skilled employees for a proposed HDRS emissions measurement program at the Arizona-Mexico border. It is important to note that measurement of emissions by remote sensing is still an emerging technology that has limitations in its application. ADOT can partner with ADEQ to determine if a monitoring program is warranted at the border at this time. ADEQ has an established air quality monitoring program throughout the state and has trained staff, equipment, and facilities to support such a program.
    • Format:
    • Funding:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26