Oregon Route 224 Corridor Study: Phase 1 – Existing Conditions Assessment
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

All these words:

For very narrow results

This exact word or phrase:

When looking for a specific result

Any of these words:

Best used for discovery & interchangable words

None of these words:

Recommended to be used in conjunction with other fields

Language:

Dates

Publication Date Range:

to

Document Data

Title:

Document Type:

Library

Collection:

Series:

People

Author:

Help
Clear All

Query Builder

Query box

Help
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

Oregon Route 224 Corridor Study: Phase 1 – Existing Conditions Assessment

Filetype[PDF-8.30 MB]


Select the Download button to view the document
This document is over 5mb in size and cannot be previewed
  • English

  • Details:

    • Resource Type:
    • Edition:
      Final Report
    • Abstract:
      In 2020, the Mount Hood National Forest experienced unprecedented catastrophic wildfire events that damaged recreational sites and transportation assets along the Clackamas River corridor. A 19-mile segment of OR 224, the primary route connecting travelers from the Portland metro area to the forest, has been closed to the public since the Riverside Fire due to hazardous conditions and ongoing rehabilitation work. Post-fire assessments and emergency repairs have been completed over the past year to determine the scale of damage, anticipate high-risk areas in the changed landscape, and stabilize the roadway. To leverage the ongoing recovery efforts happening in the Mount Hood National Forest, the U.S. Forest Service (USFS) requested technical planning assistance from the Federal Highway Administration (FHWA) Office of Federal Lands Highway Western Federal Lands Highway Division (WFLHD) to complete an Existing Conditions Assessment of the OR 224 corridor to better understand the extent of post-wildfire conditions as they relate to future use and transportation system resiliency within the National Forest. The Phase 1 Existing Conditions Assessment is the first of a two-phase Corridor Study for OR 224 and its purpose is to evaluate and document current baseline conditions along the closed portion of the corridor with a focus on safety, traffic operations, unstable slopes, and hydrology features. The findings from the Phase 1 Existing Conditions Assessment include technical recommendations, data gaps, and areas of further study for a Phase 2 OR 224 Corridor Master Plan. A high-level Phase 2 Corridor Master Plan scope and project budget was also developed to assist the USFS and ODOT in seeking additional funding resources for comprehensive planning, as they become available. While this Phase 1 baseline assessment offers valuable insights into current conditions, a Corridor Master Plan is needed to develop a long-term, coordinated vision and related goals for the impacted area, further investigate high risk areas along the corridor, develop initial site designs for priority transportation improvements, and identify a comprehensive suite of capital projects and policy recommendations that support the many uses of the Mount Hood National Forest while enhancing transportation access.
    • Format:
    • Main Document Checksum:
    • File Type:

    Supporting Files

    • No Additional Files

    More +

    Related Documents

    You May Also Like

    Checkout today's featured content at rosap.ntl.bts.gov

    Version 3.26